26.07.2006 was installed automatic hydrometeo Buoy DB4280 (AANDERAA, Norway)in the area Novorossiysk port.
07.10.2005 Satellite mooring System was put in commission in the Area of Operational Responsibility of CPC-R Marine Terminal to improve the safety of SPMs operation.
30.09.2004 Automated System of hydrometeo monitoring was put in commission in the Area of Operational Responsibility of CPC-R Marine Terminal to improve the safety of SPMs operation.
29.07.2003 Laser Docking System (LDS) was installed on the oil terminals of the Novorossiysk Commercial Sea Port.